Dark mode allows you to save up to 30% battery and reduce your ecological footprint. Are you sure you want to change mode?

Three New Bailey

With an interlacing red brick façade in homage to Salford’s textile history, Three New Bailey Square is the third office development within the New Bailey masterplan.
View Post

Brighton Metropolitan College

Situated on Pelham street, Brighton, Phase 2 is an extensive refurbishment of the 9-storey central tower, involving over-cladding of the existing façade with a contemporary curtain wall and rainscreen system. 
View Post

Prince of Wales Drive

Wintech have provided Façade Engineering & Design consultancy services on The Prince of Wales Development Phases 1, 2 & 3.
View Post