Dark mode allows you to save up to 30% battery and reduce your ecological footprint. Are you sure you want to change mode?

Brighton Metropolitan College

Situated on Pelham street, Brighton, Phase 2 is an extensive refurbishment of the 9-storey central tower, involving over-cladding of the existing façade with a contemporary curtain wall and rainscreen system. 
View Post

Three New Bailey

With an interlacing red brick façade in homage to Salford’s textile history, Three New Bailey Square is the third office development within the New Bailey masterplan.
View Post

Prince of Wales Drive

Wintech have provided Façade Engineering & Design consultancy services on The Prince of Wales Development Phases 1, 2 & 3.
View Post

Edition

Wintech is delighted to contribute our façade consultancy and access services expertise to Edition, an exceptional build-to-rent development in the cultural heart of Birmingham.
View Post