Kings Cliffe Primary School
Kings Cliffe Primary School, Peterborough, is a highly efficient A rated EPC building with features including photo-voltaic panels
View Post
Prince of Wales Drive
Wintech have provided Façade Engineering & Design consultancy services on The Prince of Wales Development Phases 1, 2 & 3.
View Post
Midland Metropolitan Hospital
Wintech provided a variety of specialist services, including the production of preliminary structural and thermal calculations, as well as providing concept design support.
View Post
The Ceramic Building
The Ceramic Building on 87 Newington Causeway is 24 storeys high and accommodates a 140-bedroom hotel, 49 residential units and a ground level retail unit.
View Post
Heathrow House
Heathrow House at 785 Bath Road will see the design, construction and completion of the conversion of existing offices and commercial spaces
View Post
The Lyng Centre for Health and Social Care
The Lyng Centre for Health and Social Care is not only an example of the best in flexible, modern healthcare but has acted as a catalyst for regeneration
View Post
Mill Rise Village
Mill Rise Village combines primary care services, with extra care housing for the over 55s – the first facility of its kind outside London.
View Post
Chelmsley Wood Primary Care Centre
The first project to be delivered by Birmingham & Solihull LIFT, Chelmsley Wood is the trailblazer to a programme to regenerate the whole of North Solihull.
View Post
Edition
Wintech is delighted to contribute our façade consultancy and access services expertise to Edition in the cultural heart of Birmingham
View Post
Istanbul Airport
Istanbul airport completed in phases in 2018 and aims to eventually serve 200 million passengers annually. The airport comprises comprise four terminals with Terminal One becoming the largest under one roof in the world, measuring a gross floor area close to one million square metres. This makes it one of the world’s largest enclosed spaces.
View Post
More Articles