University of Wolverhampton Business School
The 6-storey building for the University of Wolverhampton provides offices and teaching facilities for undergraduate, postgraduate and executive students
View Post
The Boathouse, Wallingford
Topographical survey and measured building survey – floor plans and elevations. Carried out for Greene King following extensive flooding by the River Thames earlier this year, to enable insurance claim and refurbishment.
View Post
Midland Metropolitan Hospital
Wintech provided a variety of specialist services, including the production of preliminary structural and thermal calculations, as well as providing concept design support.
View Post
Burton Place
Confronted with challenges regarding the façade’s composition, the decision was made to completely overhaul the façade of Burton Place
View Post
Heathrow House
Heathrow House at 785 Bath Road will see the design, construction and completion of the conversion of existing offices and commercial spaces
View Post
Sansom Rd
The development at Sansom Road required the demolition of an existing 2 storey carpark in a residential area close to an above ground railway line.
View Post
Brooklands Health Centre
Brooklands Health Centre, which is run by The Practice Group, consists of a primary care medical centre, a dentist and cafe.
View Post
Electric Quarter
The proposed Electric Quarter development of the Middlesex University Campus for residential use comprised four blocks of community facilities
View Post
Quartz House
Wintech Group are proud to announce that, after a recent refurbishment of our Head Office, Quartz House, it is now operating at net zero
View Post
The Lyng Centre for Health and Social Care
The Lyng Centre for Health and Social Care is not only an example of the best in flexible, modern healthcare but has acted as a catalyst for regeneration
View Post
More Articles