Brooklands Health Centre
Details
- Location: Milton Keynes
- Status: Completed
Services
- As-Built Drawings
- BIM
- BRUKL
- Design Review
- Detailed Design
- EPC
- Mechanical & Electrical
- Specification Writing
- Thermal Modelling
Brooklands Health Centre
Details
- Location: Milton Keynes
- Status: Completed
Services
- As-Built Drawings
- BIM
- BRUKL
- Design Review
- Detailed Design
- EPC
- Mechanical & Electrical
- Specification Writing
- Thermal Modelling
Brooklands Health Centre, which is run by The Practice Group, consists of a primary care medical centre, a dentist and café.


It has the capacity to cater for up to 22,500 patients. This state-of-the-art, three-storey health centre for Milton Keynes Council and the NHS provides health services to the town’s eastern expansion area and serves residents of the new districts of Broughton Gate, Brooklands, Glebe Meadows and Eagle Farm.
Wintech’s scope of services included Design Review, BIM Level 2, Detailed Design & Specification to Stage 5, Thermal Modelling, As-Built Drawings, As-Built 3D Modelling and BRUKL & EPC reporting.
Related Projects

Chelmsley Wood Primary Care Centre
The first project to be delivered by Birmingham & Solihull LIFT, Chelmsley Wood is the trailblazer to a programme to regenerate the whole of North Solihull.

Mill Rise Village
Mill Rise Village combines primary care services, with extra care housing for the over 55s – the first facility of its kind outside London.

The Lyng Centre for Health and Social Care
The Lyng Centre for Health and Social Care is not only an example of the best in flexible, modern healthcare but has acted as a catalyst for regeneration

SENSE TouchBase Pears
TouchBase Pears, Birmingham, is a pioneering and innovative new build development for SENSE, a national charity that supports deaf-blind people

British Museum – Archaeological Research Collection
This 15,500m² state-of-the-art facility is located adjacent to the University of Reading’s Thames Valley Science Park in Shinfield, Berkshire.

Station House
The Station House project consisted of the conversion of 4-storeys of office space above the railway station concourse and retail areas into 200 apartments.
