Dark mode allows you to save up to 30% battery and reduce your ecological footprint. Are you sure you want to change mode?

Hemisphere

Details

  • Architect: AHR Architects
  • Developer: Sciontec
  • Location: Liverpool
  • Status: Ongoing

Services

  • Concept Design
  • Façade Workshop Meetings
  • Specification Writing
  • Structural Calculations
  • Thermal Calculations

Hemisphere

Details

  • Architect: AHR Architects
  • Developer: Sciontec
  • Location: Liverpool
  • Status: Ongoing

Services

  • Concept Design
  • Façade Workshop Meetings
  • Specification Writing
  • Structural Calculations
  • Thermal Calculations

Wintech are delighted to be part of the prestigious Hemisphere project in Paddington Village, for Sciontec. Hemisphere is a Grade A commercial office building and has recently received approval from Liverpool City Council for its planning application. The development aims to be the first ‘Net Zero Operational Carbon’ building in Liverpool and will provide 120,000 sq. ft of innovative workspace over eight-storeys.

The building will be designed to showcase a part of the human anatomy – the brain. Getting its name from the two sides of the human brain, where the right hand cerebrum is creative and imaginative and the left academic and logical, Hemisphere will embody these characteristics. Wintech have been appointed as Façade Engineering Consultants from stage 3, to support the pre-construction design and development of the building envelope.