AutoGlym, Letchworth
Details
- Location: Letchworth, Hertfordshire
- Status: Completed
Services
- Floor Plans
- Street Scene Elevation
AutoGlym, Letchworth
Details
- Location: Letchworth, Hertfordshire
- Status: Completed
Services
- Floor Plans
- Street Scene Elevation
A measured building survey was commissioned for the refurbishment of the AutoGlym laboratory block. The survey included a street scene elevation to assist with the planning application, and floor plans of the laboratory block for use in the design process.
Our Trimble X7 3D laser scanner was used to capture point cloud data internally and externally to produce CAD plans.


Planning has now been granted for a 5500 sqm warehouse extension to contain a racking system 11.0m high.
We have been appointed to carry out the structural and civil engineering design. This consists of structural design of the steel frame, foundations, and flat concrete floor slab suitable for racking and automated picking/packing. The drainage will be designed to incorporate rainwater harvesting to use within the manufacturing processes on site.
Related Projects

Electric Quarter
The proposed Electric Quarter development of the Middlesex University Campus for residential use comprised four blocks of community facilities
Victoria Shopping Centre Clock Tower
The Victoria Centre is a shopping centre in the heart of Nottingham, and it occupies the site of the former Nottingham Victoria railway station. The station was demolished in 1967, except for two structures: the former station clock tower and the Victoria Station Hotel. These were the only elements of the original station preserved during the redevelopment.

Sansom Rd
The development at Sansom Road required the demolition of an existing 2 storey carpark in a residential area close to an above ground railway line.

Rabans Lane, Aylesbury
Formerly a Sony CD factory, this was a large demolished site on Rabans Lane. Wintech's Surveying team carried out a Topographical survey

Faraday Road
The development on Faraday Road involved the construction of three B8 24-hour operation warehouses, ancillary buildings, carparking and security enclosure.
