Dark mode allows you to save up to 30% battery and reduce your ecological footprint. Are you sure you want to change mode?

Welbourne

Welbourne is a key component in the transformational masterplan for Tottenham Hale.
View Post

Stonebridge 10

The development consisted of 117 residential dwellings split between a 9-storey block, four three-storey blocks, all above an underground carpark and a further row of 12 terraced houses facing Hillside Road, including canal diversion and associated infrastructure works.
View Post

SENSE TouchBase Pears

TouchBase Pears, Birmingham, is a pioneering and innovative new build development for SENSE, a national charity that supports deaf-blind people or those who have sensory impairments.
View Post

AutoGlym, Letchworth

A measured building survey was commissioned for the refurbishment of AutoGlym’s laboratory block.
View Post

Yas Arena, Abu Dhabi

View Post

University of Wolverhampton Business School

The 6-storey building for the University of Wolverhampton provides offices and teaching facilities for undergraduate, postgraduate and executive students, together with meeting rooms and a café.
View Post

The Boathouse, Wallingford

Topographical survey and measured building survey – floor plans and elevations. Carried out for Greene King following extensive flooding by the River Thames earlier this year, to enable insurance claim and refurbishment.
View Post

Pendleton

Wintech were appointed as Façade Consultants on the Pendleton High Rise refurbishment project, collaborating alongside Pick Everard (Consultant Team Leader, Lead Design Consultant and Principal Designer), Quaysquare Consult Ltd (Construction Management) and the client PTOL.
View Post

Heathrow House

Conveniently located close to Heathrow Airport in Hounslow, this development at 785 Bath Road will see the design, construction and completion of the conversion of existing offices and commercial spaces in to 169 self-contained residential apartments.
View Post

Burton Place

Confronted with challenges regarding the façade’s composition due to predominately being constructed with combustible timber materials, the decision was made to completely overhaul the façade of Burton Place, including the removal of all windows, sliding doors, balcony and terrace timber decking and timber shutters to all balconies complete with all cavity barriers.
View Post
More Articles