Stoke Sixth Form College
The M&E services were designed to suit the flexible occupancy of the college with heating, cooling and lighting that automatically responds to occupancies minimising energy use throughout and achieving a “Very Good” BREEAM rating.
View Post
Rabans Lane, Aylesbury
Formerly a Sony CD factory in Aylesbury, this was a large demolished site for a major housebuilder.
View Post
British Museum – Archaeological Research Collection
This 15,500m² state-of-the-art facility is located adjacent to the University of Reading’s Thames Valley Science Park in Shinfield, Berkshire.
View Post
First Street
Wintech provided a full set of consultancy services from stage 2 to completion on this high-rise residential scheme in the heart of Manchester.
View Post
Richmond Park
Ongoing engineering surveys for a large residential development in Kent included setting out over 450 borehole locations for geotechnical investigation across the site, following some foundation failures.
View Post
Two Fifty One
Two Fifty One is a mixed use scheme complimenting the vibrant area of Elephant and Castle, Southwark Bridge Road, London. The development comprises of two distinctive buildings: the 41-storey residential tower and the adjacent 7-storey commercial building.
View Post
Old Electricity Works
The site comprises a former electricity works converted into a mixed-use development of 107 homes and new commercial space. The site also consists of warehouses and buildings in light industrial use.
View Post
Arts University Bournemouth – Enterprise Pavilion
The Enterprise Pavilion nurtures a dynamic young creative community.
View Post
Faraday Road
Development of three warehouse and associated infrastructure works
View Post
Kings Cliffe Primary School
Kings Cliffe Primary School, Peterborough, is a highly efficient A rated EPC building with features including photo-voltaic panels, triple glazed windows and super insulated construction.
View Post
More Articles